Construction intelligence
BracenBuild turns site walks into measurable progress — observed in the field, weighted across the project, and used to substantiate every progress claim.
Live in production · Running on a large occupied multifamily renovation in Los Angeles · Los Angeles, California
The problem
On a large multifamily renovation, percent-complete arrives as an opinion from the field, days or weeks after the work. Owners, lenders and contractors then argue over a number nobody actually measured.
Every party on the job is paying for the same walk to happen three times, and still no one trusts the result.
What BracenBuild does
The unit list comes straight from the architectural PDF. There is no spreadsheet to build and none to maintain.
Scope items carry whole-number weights per project, overridable per building, so percent-complete is arithmetic rather than opinion.
On every walk: not started, in progress, complete, blocked, or not visible. A unit nobody looked at is not a unit at zero.
In parallel with the incumbent, rather than demanding replacement on day one. Nothing has to be switched off to start.
Built for robots from the first commit
The assessment engine does not know what carried the camera down the corridor. A handheld 360 rig today; a quadruped or a humanoid tomorrow. Same interface, no rewrite — the robot becomes a capture device the platform already knows how to consume.
Straight about the gap: automated observation from footage is the next build. Today a walk is assessed by a person against the capture. The architecture to receive an autonomous walk is already in place; the vision pipeline is not.
Building a humanoid or quadruped? An active site is approved for robot testing. Ask for the pilot site offer.

What is live today
Not a roadmap. Every line below is deployed and in use on a large occupied multifamily renovation in Los Angeles.
The full product strategy — intelligence loop, accountability engine, financial and schedule layers. Roadmap, not a feature list.
Nearest of those: attaching that evidence to a pay-application line, so a percentage on a draw traces back to the walk it came from. The join and the endpoint exist; the screen for it does not yet.
BracenBuild White Paper v1.0 — Vision & Product Strategy (PDF)
The ask
One building, one scope. You supply the site and the drawings; I supply the unit map, the scope weights and the assessment platform.